See the live Australia fire map

Fire near Lockhart River (QLD)

Satellite detection (unconfirmed)

Intense fire near Lockhart River (QLD), first detected 15 Nov 2026 and last seen . It has been picked up by 179 satellite detections, peaking at 66 MW.

Status
Active
First detected
15 Nov 2026, 03:23 UTC
Last detected
17 Nov 2026, 15:48 UTC
Duration
60.4 h
Detections
179
Peak intensity (FRP)
66 MW
Peaked at
17 Nov, 00:16 UTC
Fire footprint
6.6 km × 5.8 km
Detection sources
159 DEA, 20 FIRMS
State
QLD
Confirmation
Satellite only
Data source
DEA,FIRMS

How this fire has evolved

Satellite detections per day and the strongest reading each day — a quick sense of when this fire flared up and when it eased. Times are UTC.

DayDetectionsPeak intensitySources
15 Nov 2026 33 15 MW DEA
16 Nov 2026 71 64 MW DEA
17 Nov 2026 75 66 MW FIRMS, DEA

Satellite detections — 179 hot spots

This fire is 179 satellite heat detections merged into one event across 3 days (159 DEA, 20 FIRMS). Each row is one satellite pass over a burning pixel — all of them are plotted on the map above, where the most recent detections are ringed in white. Tap any point on the map for its time and intensity, or switch on the heat map (top-right) to see where activity concentrated.

Time (UTC)IntensitySourceLatitude, Longitude
17 Nov 2026, 15:48 1 MW FIRMS -12.846, 143.340
17 Nov 2026, 15:46 1 MW DEA -12.846, 143.340
17 Nov 2026, 15:46 1 MW DEA -12.846, 143.340
17 Nov 2026, 06:09 17 MW DEA -12.884, 143.309
17 Nov 2026, 06:09 57 MW DEA -12.886, 143.297
17 Nov 2026, 06:09 57 MW FIRMS -12.886, 143.297
17 Nov 2026, 06:09 17 MW FIRMS -12.884, 143.309
17 Nov 2026, 05:56 16 MW DEA -12.881, 143.311
17 Nov 2026, 05:56 8 MW DEA -12.891, 143.281
17 Nov 2026, 05:56 8 MW DEA -12.891, 143.291
17 Nov 2026, 05:56 42 MW DEA -12.891, 143.301
17 Nov 2026, 05:56 9 MW DEA -12.891, 143.321
17 Nov 2026, 04:40 1 MW FIRMS -12.885, 143.298
17 Nov 2026, 04:39 1 MW DEA -12.885, 143.298
17 Nov 2026, 04:26 — DEA -12.847, 143.332
17 Nov 2026, 03:56 4 MW DEA -12.852, 143.341
17 Nov 2026, 03:56 4 MW DEA -12.849, 143.341
17 Nov 2026, 03:56 8 MW DEA -12.850, 143.333
17 Nov 2026, 03:56 6 MW DEA -12.852, 143.338
17 Nov 2026, 03:56 6 MW DEA -12.848, 143.341
17 Nov 2026, 03:56 6 MW DEA -12.849, 143.333
17 Nov 2026, 03:56 4 MW DEA -12.852, 143.341
17 Nov 2026, 03:56 4 MW DEA -12.849, 143.341
17 Nov 2026, 03:56 8 MW DEA -12.850, 143.333
17 Nov 2026, 03:56 6 MW DEA -12.852, 143.338
17 Nov 2026, 03:56 6 MW DEA -12.848, 143.341
17 Nov 2026, 03:56 6 MW DEA -12.849, 143.333
17 Nov 2026, 03:56 11 MW DEA -12.884, 143.307
17 Nov 2026, 03:56 9 MW DEA -12.885, 143.299
17 Nov 2026, 03:56 7 MW DEA -12.894, 143.327
17 Nov 2026, 03:56 3 MW DEA -12.890, 143.330
17 Nov 2026, 03:56 12 MW DEA -12.890, 143.326
17 Nov 2026, 03:56 5 MW DEA -12.893, 143.306
17 Nov 2026, 03:56 3 MW DEA -12.886, 143.330
17 Nov 2026, 03:56 5 MW DEA -12.889, 143.306
17 Nov 2026, 03:56 5 MW DEA -12.885, 143.309
17 Nov 2026, 03:56 5 MW DEA -12.886, 143.305
17 Nov 2026, 03:56 7 MW DEA -12.887, 143.301
17 Nov 2026, 03:56 7 MW DEA -12.887, 143.297
17 Nov 2026, 03:56 10 MW DEA -12.881, 143.317
17 Nov 2026, 03:56 5 MW DEA -12.882, 143.305
17 Nov 2026, 03:56 11 MW DEA -12.884, 143.307
17 Nov 2026, 03:56 9 MW DEA -12.885, 143.299
17 Nov 2026, 03:56 7 MW DEA -12.894, 143.327
17 Nov 2026, 03:56 3 MW DEA -12.890, 143.330
17 Nov 2026, 03:56 12 MW DEA -12.890, 143.326
17 Nov 2026, 03:56 5 MW DEA -12.893, 143.306
17 Nov 2026, 03:56 3 MW DEA -12.886, 143.330
17 Nov 2026, 03:56 5 MW DEA -12.889, 143.306
17 Nov 2026, 03:56 5 MW DEA -12.885, 143.309
17 Nov 2026, 03:56 5 MW DEA -12.886, 143.305
17 Nov 2026, 03:56 7 MW DEA -12.887, 143.301
17 Nov 2026, 03:56 7 MW DEA -12.887, 143.297
17 Nov 2026, 03:56 10 MW DEA -12.881, 143.317
17 Nov 2026, 03:56 5 MW DEA -12.882, 143.305
17 Nov 2026, 03:55 6 MW FIRMS -12.852, 143.338
17 Nov 2026, 03:55 4 MW FIRMS -12.852, 143.342
17 Nov 2026, 03:55 8 MW FIRMS -12.849, 143.333
17 Nov 2026, 03:55 6 MW FIRMS -12.849, 143.334
17 Nov 2026, 03:55 4 MW FIRMS -12.848, 143.341
17 Nov 2026, 03:55 6 MW FIRMS -12.848, 143.342
17 Nov 2026, 03:55 7 MW FIRMS -12.893, 143.327
17 Nov 2026, 03:55 5 MW FIRMS -12.893, 143.307
17 Nov 2026, 03:55 12 MW FIRMS -12.890, 143.327
17 Nov 2026, 03:55 5 MW FIRMS -12.889, 143.306
17 Nov 2026, 03:55 7 MW FIRMS -12.887, 143.298
17 Nov 2026, 03:55 7 MW FIRMS -12.886, 143.302
17 Nov 2026, 03:55 5 MW FIRMS -12.886, 143.306
17 Nov 2026, 03:55 5 MW FIRMS -12.885, 143.310
17 Nov 2026, 03:55 5 MW FIRMS -12.882, 143.305
17 Nov 2026, 03:55 10 MW FIRMS -12.880, 143.317
17 Nov 2026, 01:36 30 MW DEA -12.898, 143.302
17 Nov 2026, 00:16 31 MW DEA -12.898, 143.302
17 Nov 2026, 00:16 66 MW DEA -12.898, 143.320
17 Nov 2026, 00:06 20 MW DEA -12.898, 143.320
16 Nov 2026, 08:16 19 MW DEA -12.898, 143.302
16 Nov 2026, 07:36 24 MW DEA -12.898, 143.302
16 Nov 2026, 07:36 15 MW DEA -12.898, 143.320
16 Nov 2026, 07:16 13 MW DEA -12.878, 143.302
16 Nov 2026, 07:16 34 MW DEA -12.898, 143.302
16 Nov 2026, 07:06 20 MW DEA -12.898, 143.302
16 Nov 2026, 07:06 19 MW DEA -12.898, 143.320
16 Nov 2026, 06:56 22 MW DEA -12.878, 143.302
16 Nov 2026, 06:56 23 MW DEA -12.898, 143.302
16 Nov 2026, 06:46 21 MW DEA -12.878, 143.302
16 Nov 2026, 06:46 18 MW DEA -12.878, 143.320
16 Nov 2026, 06:46 22 MW DEA -12.898, 143.302
16 Nov 2026, 06:16 20 MW DEA -12.878, 143.302
16 Nov 2026, 06:16 31 MW DEA -12.878, 143.320
16 Nov 2026, 06:06 44 MW DEA -12.878, 143.320
16 Nov 2026, 06:06 33 MW DEA -12.898, 143.320
16 Nov 2026, 05:46 32 MW DEA -12.878, 143.320
16 Nov 2026, 05:46 19 MW DEA -12.898, 143.320
16 Nov 2026, 05:36 27 MW DEA -12.898, 143.320
16 Nov 2026, 05:26 64 MW DEA -12.898, 143.320
16 Nov 2026, 05:16 45 MW DEA -12.898, 143.320
16 Nov 2026, 05:16 33 MW DEA -12.878, 143.320
16 Nov 2026, 04:15 8 MW DEA -12.860, 143.337
16 Nov 2026, 04:15 9 MW DEA -12.849, 143.339
16 Nov 2026, 04:15 8 MW DEA -12.860, 143.337
16 Nov 2026, 04:15 9 MW DEA -12.849, 143.339
16 Nov 2026, 04:15 30 MW DEA -12.888, 143.324
16 Nov 2026, 04:15 11 MW DEA -12.880, 143.330
16 Nov 2026, 04:15 8 MW DEA -12.890, 143.326
16 Nov 2026, 04:15 8 MW DEA -12.890, 143.322
16 Nov 2026, 04:15 8 MW DEA -12.886, 143.325
16 Nov 2026, 04:15 6 MW DEA -12.886, 143.329
16 Nov 2026, 04:15 8 MW DEA -12.887, 143.321
16 Nov 2026, 04:15 6 MW DEA -12.881, 143.332
16 Nov 2026, 04:15 6 MW DEA -12.882, 143.328
16 Nov 2026, 04:15 30 MW DEA -12.888, 143.324
16 Nov 2026, 04:15 11 MW DEA -12.880, 143.330
16 Nov 2026, 04:15 8 MW DEA -12.890, 143.326
16 Nov 2026, 04:15 8 MW DEA -12.890, 143.322
16 Nov 2026, 04:15 6 MW DEA -12.886, 143.329
16 Nov 2026, 04:15 8 MW DEA -12.887, 143.321
16 Nov 2026, 04:15 6 MW DEA -12.881, 143.332
16 Nov 2026, 04:15 6 MW DEA -12.882, 143.328
16 Nov 2026, 04:01 — DEA -12.847, 143.332
16 Nov 2026, 04:01 — DEA -12.847, 143.336
16 Nov 2026, 04:01 — DEA -12.851, 143.336
16 Nov 2026, 04:01 — DEA -12.858, 143.332
16 Nov 2026, 04:01 — DEA -12.881, 143.321
16 Nov 2026, 04:01 — DEA -12.881, 143.324
16 Nov 2026, 04:01 — DEA -12.881, 143.328
16 Nov 2026, 04:01 — DEA -12.884, 143.317
16 Nov 2026, 04:01 — DEA -12.884, 143.321
16 Nov 2026, 04:01 — DEA -12.884, 143.324
16 Nov 2026, 04:01 — DEA -12.888, 143.317
16 Nov 2026, 04:01 — DEA -12.888, 143.321
16 Nov 2026, 03:17 19 MW DEA -12.883, 143.329
16 Nov 2026, 03:17 19 MW DEA -12.884, 143.321
16 Nov 2026, 03:17 12 MW DEA -12.882, 143.330
16 Nov 2026, 03:17 26 MW DEA -12.883, 143.322
16 Nov 2026, 03:17 18 MW DEA -12.886, 143.327
16 Nov 2026, 03:17 18 MW DEA -12.887, 143.323
16 Nov 2026, 03:17 25 MW DEA -12.886, 143.324
16 Nov 2026, 03:17 19 MW DEA -12.883, 143.329
16 Nov 2026, 03:17 19 MW DEA -12.884, 143.321
16 Nov 2026, 03:17 12 MW DEA -12.882, 143.330
16 Nov 2026, 03:17 26 MW DEA -12.883, 143.322
16 Nov 2026, 03:17 18 MW DEA -12.887, 143.323
16 Nov 2026, 03:04 — DEA -12.881, 143.321
16 Nov 2026, 03:04 — DEA -12.881, 143.324
16 Nov 2026, 03:04 — DEA -12.884, 143.321
16 Nov 2026, 03:04 — DEA -12.884, 143.324
15 Nov 2026, 04:34 3 MW DEA -12.858, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.854, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.858, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.854, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.858, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.854, 143.336
15 Nov 2026, 04:34 3 MW DEA -12.883, 143.331
15 Nov 2026, 04:34 4 MW DEA -12.883, 143.327
15 Nov 2026, 04:34 3 MW DEA -12.883, 143.331
15 Nov 2026, 04:34 4 MW DEA -12.883, 143.327
15 Nov 2026, 04:34 3 MW DEA -12.883, 143.331
15 Nov 2026, 04:34 4 MW DEA -12.883, 143.327
15 Nov 2026, 04:29 — DEA -12.847, 143.332
15 Nov 2026, 04:29 — DEA -12.851, 143.332
15 Nov 2026, 04:29 — DEA -12.854, 143.332
15 Nov 2026, 04:29 — DEA -12.858, 143.332
15 Nov 2026, 04:29 — DEA -12.881, 143.324
15 Nov 2026, 04:29 — DEA -12.881, 143.328
15 Nov 2026, 03:35 15 MW DEA -12.857, 143.336
15 Nov 2026, 03:35 5 MW DEA -12.860, 143.335
15 Nov 2026, 03:35 5 MW DEA -12.855, 143.338
15 Nov 2026, 03:35 5 MW DEA -12.856, 143.334
15 Nov 2026, 03:35 6 MW DEA -12.851, 143.334
15 Nov 2026, 03:35 15 MW DEA -12.857, 143.336
15 Nov 2026, 03:35 5 MW DEA -12.860, 143.335
15 Nov 2026, 03:35 5 MW DEA -12.855, 143.338
15 Nov 2026, 03:35 5 MW DEA -12.856, 143.334
15 Nov 2026, 03:35 6 MW DEA -12.851, 143.334
15 Nov 2026, 03:35 2 MW DEA -12.882, 143.330
15 Nov 2026, 03:35 2 MW DEA -12.882, 143.330
15 Nov 2026, 03:23 — DEA -12.851, 143.332
15 Nov 2026, 03:23 — DEA -12.854, 143.332
15 Nov 2026, 03:23 — DEA -12.858, 143.332

Other fires nearby

This is an unconfirmed satellite detection, not an official warning. Satellites detect heat, which may be a bushfire, a hazard-reduction burn, or industrial activity. Always check the official source and, in an emergency, call 000.

Official information for QLD: Queensland Fire Department.

Frequently asked questions

Is this a real bushfire?

Unless it is marked as matched to an official incident, this is an unconfirmed satellite detection. Satellites detect heat, which can be a bushfire, a hazard-reduction burn or an industrial source. Check the official warnings for confirmation.

What does “peak intensity (FRP)” mean?

FRP (fire radiative power, in megawatts) is how much heat the fire was giving off when a satellite detected it. The peak is the highest reading across all detections — a rough guide to how intense the fire has been.

Why are several nearby detections shown as one fire?

We group satellite detections that are close together in space and time into a single fire event, so a fire front seen across multiple passes appears as one fire rather than scattered dots.

How do I get the official information for this fire?

Follow the official source link on this page (where available) and your state fire agency. In an emergency call 000.